Reconstruction of Bayview & Glenwood

Installation of Sanitary Sewer

Bayview & Glenwood Strathmore, Alberta

The Town of Strathmore

Allnorth Consultants Ltd.

05/22/2018 – 08/10/2018

Glenwood: The project included removal and replacement/ upsize of approximately 335 m of 200 mm diameter sanitary sewer and 445 m of 100 mm diameter water infrastructure within the road right of way. Removal and/or reconstruction of road surface and base where necessary. Curb/Gutter/Sidewalk replacement or installation where deemed necessary. Temporary sewer and water servicing where required through construction. New water and sanitary sewer mains will be 250 mm diameter PVC.

Bayview Road: The project included removal and replacement of approximately 375 m of 250 mm diameter sanitary sewer and 150 mm diameter water infrastructure within the road right of way. Asphalt pavement replacement for entire road surface from Briarwood Road to Brentwood Drive. removal and/or reconstruction of road base as well as curb/gutter/sidewalk replacement or installation where deemed necessary.

Create a website or blog at WordPress.com

Up ↑

%d bloggers like this: