Eden Valley Water System

Raw Water Reservoir 

Eden Valley 216, Longview Alberta

Stoney Tribal Administration

Associated Engineering Alberta Ltd.

25/09/2017 – 15/01/2018

The project involved construction of a raw water reservoir which included; topsoil stripping, common excavation, GCL installation, utilities relocation, structures (pumping and weeping tile manhole), piping configurations (inlet, level control & outlet, access road, culvert and fencing, and electrical (controls and instrumentation).

This slideshow requires JavaScript.

 

Create a website or blog at WordPress.com

Up ↑

%d bloggers like this: